Local planning workflow
How to build a two-plan comparison
Use a current plan as your baseline and change only the proposed setup you want to test.
- Enter only effective rates you can read or have measured.
- Leave an unknown rate blank; the planner will label the subtotal instead of coercing it to zero.
- Add capacity only if you know it for this scenario.
- Copy current to proposed, then change the intended rows.
- Review the rate difference and use the payback shortcut only if both totals are known.
- Save locally or copy a share link; shared contents are not secret.
The optional optimizer is valid only under its displayed equal-slot, additive-income assumptions. It does not discover unentered fish or game mechanics.
Open Tank Planner